The ship is designed to meet the " A" level navigation area requirements, mainly working in the Huaihe river system, combined with 350m3/h dredging construction, mainly afford (parabolic ) anchor operation and water lifting operations, but also water float line distribution ( set ), construction water traffic, dredger shift assignment transfer in general entrainment, and for supporting the dredger, water supply.
總 長(length 0.A) |
20m |
排水量(dispacement) |
90t |
水線長(waterline length) |
19.25m |
自由航速(free speed |
14.2km/h |
型 寬(molded breadth) |
6.5m |
系柱拖力(bollard pull) |
24.5KN |
型 深(molded depth) |
1.8m |
主 機( main machine) |
2×59.5kw |
吃 水(draft) |
1.05m |
|
| |